![The Pour](http://www.blarryslog.com/wp-content/uploads/2013/11/build6-6-300x225.jpg)
The Pour
Happy Hallowe’en. Time for some scary concrete. Fortunately, it’s a lovely day to pour concrete. Today is suddenly significantly warmer. Instead of -1, it was 7 at 6:30 in the morning. Since it’s Thursday, it also means I get a 3 day weekend. Looking forward to that. The body is tired after getting the forms […]
![A Foot In The Ground](http://www.blarryslog.com/wp-content/uploads/2013/10/build5-5-300x399.jpg)
A Foot In The Ground
When I arrived at the site on the day the footings were to be poured, I found this guy with the pump truck already there. He was not happy. Seems he had a hard time getting this beast down our “road” and bottomed out his back end (ha). He didn’t think he could get out. […]